The Social Framework as an alternative to the Logical Framework

Posted on 1 February, 2008 – 12:00 PM

Caveat: This post describe a proposal by Rick Davies that is still a work in progress, being tested to see how well it works and where it works. Your comments and suggestions are welcome. Please use the Comment box at the end of this posting.


A Social Framework…

  • is a format for describing an expected pathway of influence through a wider network of people, groups or organisations.
  • is a Logical Framework re-designed as if people and their relationships mattered
  • is a way of summarizing the theory-of-change within a development project, in a form that can be monitored and evaluated. And which can be easily explained to others.

The Social Framework uses the idea of pathways as a bridging concept, which can connect up two very different ways of thinking about development projects. One is the Logical Framework, which provides a very linear view of development, where events happen in a sequence of  steps, in one direction. The other is a network view of development, where change can be taking place simultaneously, in many different locations, in the relationships between many different actors.

The basic idea

The diagram below shows a number of actors, connected by relationships. It is a simple network diagram, that can be drawn using Excel or social network analysis software. The thick blue line shows a particular pathway through that network that is of interest. What is expected to happen along that pathway can be described in detail using a Social Framework format, which itself is an adaptation of the Logical Framework.

sociapathway

In the table below each of the actors that are on the blue pathway above have been given a row, where the expected changes in that actor’s behaviour can be described in detail. The rows of actors are in the same sequence as the chain of actors in the diagram above.

socialframework

Unlike the Logical Framework, there can be as many rows in the tables as needed, depending on how long the chain of actors is along the pathway. The concept of a chain of relationships has some similarity with the concepts of  Value Chains and Supply Chains

Other differences between the Social and Logical Framework

The two frameworks appear very similar in that both describe an intended process of change as a series of events taking place across a sequence of rows. Starting at the bottom and going upwards. But there are important differences…

1. Time versus people

In the Logical Framework this vertical dimension represents the flow of time, starting from the present at the bottom and moving to the future at the top. This flow is broken into different stages, represented by each row. The types of events taking place in each of these rows are given different names, typically: Activities, Outputs, Purpose (or outcome) and Goal (or impact). One of the challenges facing users of the Logical Framework is agreeing on where events should be placed within which categories. For example, as activities or outputs, or as outcomes or impacts. Communicating the difference between these categories to non-specialists is even more of a challenge.

In the Social Framework the vertical dimension represents a chain of actors connected by their relationships. Actors can be individuals, organisations or groups, or larger categories of organisations or groups. This choice depends on the scale of event that need to be described by the Social Framework. In the Social Framework, the relationships between actors are the means by which change happens. In the Logical Framework change is often described in more abstract terms.

2. Length and direction of influence

Unlike the four rows in the Logical Framework, this chain can be as long or short as is needed. Unlike the Logical Framework causation is likely to work in both directions, up and down the chain of relationships. Actors influence others, and they are also influenced by those others.

3. Using the traditional four columns

Both the Social and Logical Framework involve the use of four columns: a narrative description of the expected change, observable indicators of those changes (OVIs), sources of information on those indicators (MoVs), and assumptions about those changes’ relationships to wider events. The Social Framework design has deliberately kept, but adapted, these elements of the Logical Framework.

The narrative column describes the expected changes in the actors (and their relationships with each other). In the Logical Framework the narrative description is expected to be written in a depersonalised passive voice. In contrast,  the the actor-centred description in the Social Framework will make it much easier to understand, and communicate, the “storyline”.

The MoV column does not simply say where the necessary information (about the expected changes) can be found, but also who will know about these changes. Information needs to be known about by someone to be of any use. Information that exists but is not known to anyone is in effect useless.

The assumptions column describes what other relationships will also be important, because their actions (or inaction) may affect what happens to the actor in each row of the Social Framework. It is important to remember that most Social Frameworks will describe a chain of actors forming a pathway through a wider and more complex network of relationships. For example, in the table above the Assumptions section of the row describing the National NGO should say something about what is expected of their relationships with bilateral agencies and INGOs, which they are also have relationships with (shown by the orange links in the diagram).

In a Social Framework there is still a connecting logic between the different rows, as there is in the Logical Framework. However it is a social logic, with this type of form:

If the National NGO is able to provide technical advice on advocacy strategies to the Local CSOs…

And INGOs continue to  fund those Local CSOs for at least three years…

Then the Local CSOs will be able to engage more effectively with the National Government

4. Distributed accountability

One of the potential benefits of the Social Framework is that because there are change objectives for each actor in a pathway, responsibility for the whole chain functioning as intended is distributed amongst all the actors in that pathway. In Logical Framework descriptions of projects, responsibility for success often seems to lay almost solely with one organisation, usually that one closest to the intended beneficiaries. For more on this idea, see my blog posting on distributed accountability in the Katine project in Uganda

Potential complications

1. Multiple pathways

In a given project setting there may be more than one pathway. In the diagram below it is quite likely that the National NGO is communicating with the INGOs and with some Bilateral Agencies. The INGOs might be interacting with the Companies as well as Local CSOs. Where these parallel strategies are important part of the overall project design these auxilary pathways could be documented in supporting Social Frameworks. Their existence could be referred to in the appropriate Assumptions cell of the central Social Framework.

2. Multiple views of how someone should change

For any given actor in a chain of relationships there may be different views about how they should change (e.g. they will have their own view, and so will others in immediate relationships with them). How do you reconcile these different views?

If the Social Framework  was developed through a participatory process then these differences should be expected to arise during that process, and may be resolved. It should be relatively easy to design a Social Framework by participatory means because each stakeholder should be able to see where they fit in to the picture, either directly as an actor in the pathway, or indirectly via an Assumptions statement in one or more of the rows.

If the Social Framework  was developed to reflect the views of one stakeholder, then their conflicting view of how another actor needs to change may limit their ability to affect change down a given pathway.  Or, on discovering that there is a difference in views, they may then try to persuade the other to change in the way they think is needed, and end up being successful. This might be the case with the Local CSOs relationship with National Government, in the simple diagrammatic view shown above.

3. How do you fit short term, medium term and long term changes in Social Framework?

For a given actor there may be different objectives (expected changes) for different time periods. In the short term they may be to be able to do x, in the medium term they may hope to be to do y and in the long term they may want to be to do z.  Multiple objectives can be listed, in time order, within each actor’s own row. Similarly with the indicators for each of these in the next column.

Changes in the short versus long term can also be captured by describing multiple pathways, some of which are important in the early stages of a project and some which are more important later on, during and after the project ends.

How does all this relate to Outcome Mapping?

I am not an advocate of Outcome Mapping, but there is an overlap in approach with the actor focused structure of the Social Framework. Elsewhere, I have written a one-pager looking at the similarities and differences between Outcome Mapping and Network Models (which Social Frameworks relate to).

If people are using Outcome Mapping but also want something like the Logical Framework to summarise the project intentions (and theory of change) then the following interpretations might be useful:

  • In a Social Framework, adjacent actors are each others’ Boundary Partners. Other actors mentioned in the Assumptions column of a given actor might also become their Boundary Partners.
  • Outcome Challenges are the expected changes to be describing in the first column, for each actor in the Social Framework
  • Progress markers could be listed in the Indicators column, for the respective Boundary Partner
  • Strategy maps could be described using a network diagram similar to the one used immediately above. Each pathway would need to be highlighted, including their relative importance.

For related posts see:

Postscript

I have just been re-reading the new DFID “Guidance on using the revised Logical Framework“  On page 9 there is a graphic illustrating an “example of a Results Chain and how it aligns with the logframe format” It interested me because it it is a good example of yet another disembodied theory of change, where changes happen but there are no identifiable actors present (except children at Purpose level). This must make the process of monitoring and evaluation more difficult (even in this simple example) and make communication of the project design to others more difficult also.

disembodied changes

Tags: , , , , Print This Post Print This Post

1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
Loading ... Loading ...

  1. 7 Responses to “The Social Framework as an alternative to the Logical Framework”

  2. Hi Rick,
    I grabbed a moment to look at thi site. It reminds me of making sociograms – that were part of my teacher training – to map the intensities of connections between pupils to see who were the ‘opinion leaders’ through which infuence could be exerted over the whole class. What also resonated were the (overlapping) PRA chapati diagrams mapping actor/institutional relations. Fnally, what sprang to mind are the Actor+Transtacion+Motication (ATM) units of analysis that I used for a grounded theory approach to identify patterns of helping relationships between poor people. (There is a monograph on this if you are interested.) Finally, stakeholder analysis assesses relationships from the point of view of power which probably need to be factored into the mapping somehow. So, I think that the approach you are exploring has a range of supportive ideas and mechanisms.

    I particularly like the specific attention to different time frames and the notion of boundary spanners as a distinct analytic category within organisational analysis. Organisational transactions are often highly personalised (E.g., donor desk offcers)and may not respesent the organisation as a whole.

    Methinks that a starting point for practical use would be in mapping (complex) contexts, separating this from an application akin to log framing of interventions.

    Thoughts for now. More later.

    Travel well,

    Alan

    By Alan Fowler on Aug 30, 2008

  3. Nice article , I am a student from Mumbai . Doing my Mba in social entp and currently working on a project of Performance evaluation of NGOs.

    I really like the model suggested by you but i have a query. I am not clear how it can be directly used . In the sense can you explain the table of actors , ovi and assumptions with a concrete example of an NGO as i am litte confused on how to use it .

    Regards
    Sonam chawla

    By Sonam on Feb 10, 2009

  4. To add more to what i said above . If you give an example of say evaluating a website like Mande.co.uk . How would it fit in a social framework of this kind???

    By Sonam on Feb 10, 2009

  5. Hello Rick,
    Very interesting thoughts!
    I myself have been working with and on the Logical Framework for 2 decades. I still find it useful, although it has its limitations – like any other tool has.
    Within the context o project management, I have worked on adapting the Logframe towards the “lower end” of its hierarchy, because I always found the use of “main activities” little helpful. They are generally so highly aggregated that they don’t explain very much. Therefore, I have connected the output level with the WBS (Work Breakdown Structure) and other tools, in order to get closer to a realistic strategy and operational planning.
    As far as I understand, you have been concerned with the “upper end” of the Logframe, which are the outcomes and impacts. And you are right, in fact, these are actually what matters. And it is definitely true that development project must focus on behavioral changes. Therefore, your approach lies exactly within the actual mainstream of development institutions, which stress very much on the impacts.
    However, I don’t see the Social Framework and an alternative to the Logical Framework, but rather a complementary tool. For projects or programs, one will always need to construct and explicit its rationale, but I can see the Social Framework as an excellent tool to work with the stakeholders to make clear what changes in behavior and relationships have to occur, in order to achieve development goals.
    I would appreciate very much if you could provide an example of a filled in framework, to make clearer how you actually apply the tool.
    Thanks in advance,
    Peter

    By Peter on Feb 28, 2009

  1. 3 Trackback(s)

  2. Sep 17, 2009: links for 2009-09-17 « Sameer Padania
  3. Sep 18, 2009: links for 2009-09-17 « Participatory TV
  4. Nov 24, 2009: Monitoring and Evaluation NEWS » Blog Archive » The Logical Framework: A list of useful documents

Post a Comment